Project Description
DEMOLISHING OLD FLOOR
EXISTING HEATING PIPES TO BE REMOVED
PREPARING HEATING SYSTEMS CONTROLS
SELF LEVEL LATEX COMPOUND INSTALLED TO LEVEL UNEVEN FLOOR
THERMAL BOARD INSTALLATION
LAYING DOWN UNDERFLOOR HEATING PIPE
FLOORING BEING LAID
COMPLETED HEATING SYSTEMS CONTROLS
INSTALLING SMART THERMOSTAT
NEW HARDWOOD FLOORING AND WINDOWS COMPLETELY INSTALLED
FRESHLY PAINTED WALLS
INSTALLING NEWLY EXTERIOR DOORS
FINISHED!!!
The finished result is a lovely radiant warm floor that will heat the room up to 26 degrees Celsius.