Project Description
PLASTERBOARD AND FIREPROOF LOFT BEDROOM CEILING
FEATURE WINDOW INSTALLED
BEDROOM DOORWAY INSTALLED
SOUND INSULATE LOFT BEDROOM FROM LOUNGE BELOW
CONSTRUCT NEW WINDOWS TO CREATE A NEW BATHROOM
LIFT BATHROOM CEILING AND INSULATE
BEDROOM AND BATHROOM DOORWAYS CREATED
NEW ENSUITE BATHROOM STRUCTURE CREATED
LOFT ENSUITE BATHROOM NEAR COMPLETION STAGEH
HACK OFF DEFECTIVE RENDER AND PREPARE WALL FOR BONDING
STARTING TO GET SOME PAINT ON THE WALLS
THE SECOND BEDROOM PLASTERED WITH THE FIRST ELECTRICS INSTALLED
MAIN BATHROOM HEATING BEING TILLED