Project Description

Building Contractors London | Design and Build
  • GALLOW BRACKETS TO BE REMOVED

  • PAD STONE INSTALLED TO SUPPORT STEEL BEAM

  • USING ACCRO PROPS TO SUPPORT THE FRIST FLOOR BEFORE REMOVAL OF GALLOWS BRACKET CHIMNEY SUPPORT

  • MEASURING SPACE FOR THE STEEL BEAM

  • FRIST RSJ STEEL BEAM BROUGHT INTO PROPERTY

  • MAKING ROOM FOR THE RSJ STEEL BEAM TO FIT INSIDE THE PROPERTY

  • PREDRILLING THE RSJ STEEL BEAM FOR 20MM SUPPORT PLATE

  • CHIMNEY SUPPORT PLATE INSTALLED

  • STEEL BEAM ACCURATELY ADJUSTED

  • PADSTONE INSTALLED

  • SECOND RSJ STEEL BEAM INSTALL FOR CHIMNEY BREAST

  • BOTH STEELS BEAMS PROPERLY SCURED

  • BOTH BEAMS BOLTED TOGETHER

  • SECONDARY 20MM STEEL PLATE INSTALLED FOR CHIMNEY BREAST SUPPORT

  • MAKING GOOD THE PARTY WALL

  • FIREPROOF PLASTERBOARD COVERING BEAM