Project Description
Conveyor belts to remove foundation spoil
Breaking down existing manhole drainage
Foundation finches excavated
Below ground drainage modified
Setting out concrete pour dutum levels inside foundation
Go concrete! Go
Concrete poured into excavated foundation trench
Below ground inspection chamber installed
Foundation poured and cured
Subfloor preparation
Damp proof course laid ready for wall construction